Amerika Birleşik Devletleri ligi sezon 30
Forum: Ligler
Takımların son durumları ve ligler hakkında konuşabileceğiniz forum.
Stadium 11 (3)
Quick question -
I am pretty sure one of the original owners in the league has the data on how big an economic difference a stadium 11 makes in the game. Every team situated ahead of me in the standings has an S11 and have the wealth to make $250M player moves.
I will have 500M in the bank end of season and plan to spend minimally for the next few seasons. I am positioned to spend minimally and maintain a place in league 1, but it will take 5-8 seasons to reach the 1.3B needed to build S11 and then an additional 3 seasons for it to be completed.
Just wondering how long will it take to recoup $500M, then grow to the $1B mark to maximize interest keeping in mind that over that time I will have to completely overhaul the team? Any thoughts would be appreciated.
Patience, man. Honestly, getting the stadium to level 11 is a game changer. Once you get there, you can spend more freely on players.
Take it step by step: get the stadium first, and then go from there. Remember, once the stadium is at level 11, the money will start piling up!
[(85-70)*120,000+80,000(85+13+16.74)]*20-52*(1,208766-618,701)=188,900,620 increase in yearly income
Assuming you play 1-2 cup home games per year (with 2/3 income per home game), you'll earn money from increasing your ticket prices in addition to money from selling more tickets (including merchandise and food and drinks). You'll also pay a bit more in maintenance fees for the stadium. It might then take about 7-8 seasons for it to pay for itself, though it will help out a lot in the long run. As for the interest, you'll earn back at least half a billion while waiting for it to be built.
Keep in mind you'll need to be able to sell 200,000 seats per game. You can check this with the calculator included with the stadium. If you're not there yet, you'll have until the stadium is built to get there, and you could always double the staff in the fanshop to expedite the process if necessary.
Also, don't underestimate your catering.
At level 10, 3.2*200,000*20-(241,140-130,346)*52=7,038,712 additional per year
Adding one 10* staff member at level 10 catering and level 11 stadium: 19.94*(1.1*1)*200,000*19-37,253*52=81,412,044 per year
Adding a second 10* staff members at level 10 catering and level 11 stadium:
19.94*(1.1*(1.1+1))*200,000*19-37,253*52=173,096,164 per year on top of the first staff member